Related products
-
Concrete
4 ton Tip Truck Hire in Selwyn
-
Concrete
Concrete Vibrator Electric
-
Concrete
Concrete Cutting Saw
Bull Float 48″
Day |
Half Day |
24 Hour |
---|---|---|
$38 |
$35 |
$44 |
Extra Charges : $0
For finishing concrete after screeding, these floats are the thing to use. By turning the handle you can tilt the float to suit whether it is going forward or backwards. The handle comes with up to 3 length extensions, each extension is 6 feet (1.83 metres).
Specifications
4 poles available each 1.83m (6 Ft) long, 48″wide head
Special Requirements
Glove protection
Transport
Able to be carried